What Affects the Cost of Interlock Sealing?

Ask a Question
Send us a note and we'll get back to you — usually within one business day.
What you pay to have interlock sealed depends mainly on how much surface there is, what condition it is in, and how much preparation the pavers need before the sealer goes on. A tidy patio in good shape is a faster job than a long driveway with weeds and half-empty joints. The quote follows the real work of cleaning, re-sanding and sealing — not a one-size-fits-all number.
What affects the price the most
Interlock sealing is rarely a simple square-footage calculation. A few factors usually explain most of the difference between one quote and another.
- Size of the area. More pavers means more time, more joint sand and more sealer. A two-car driveway and a small front walk are two different jobs.
- Condition of the joints. If the sand between the pavers has washed out, the joints have to be topped up before sealing. Deep or wide joints take more sand and more care.
- How dirty the surface is. Moss, organic staining, oil spots and old, flaking sealer all add cleaning steps before a new coat can bond.
- Access and layout. Slopes, stairs, tight side yards and awkward corners take longer to work safely and evenly than an open, flat surface.
How the condition of the pavers changes the job
The biggest variable is usually preparation. Sealer only performs as well as the surface underneath it, so most of the labour happens before any sealer is opened.
A surface with healthy joints and a clean face may only need a thorough wash, a light top-up of sand and the sealer itself. A surface with weeds between the pavers, loose or sunken stones, or a chalky old coating needs more steps: weed removal, re-sanding, stain treatment and sometimes removal of the old sealer before a fresh coat can bond.
If the existing sealer is flaking or hazy, simply coating over it can lock the same problem underneath. Ask us whether your surface suits another coat or needs the old product addressed first.
Why GTA weather matters for interlock
Where you live changes what your interlock goes through, and that shapes both the job and how often it needs to be redone.
- Freeze-thaw cycles. Water gets into the pores of the pavers and the joints, then freezes and expands. Repeated freezing and thawing over a Toronto winter weakens the surface and loosens the joint sand.
- Road salt and ice melt. Salt carried up the driveway on car tires sits on the pavers and works into the joints with the melting water, wearing the sealer down faster.
- Spring rain. Heavy spring rain tests the joints and the base. Surfaces that drain well shed the water; surfaces that hold it take more abuse.
- Clay soil and drainage. Much of the GTA sits on slow-draining clay. If water ponds on the pavers or sits in the base, it undermines the joint sand and can move the stones.
- Summer UV. Long, hot summers fade the colour and break down the sealer over time, which is part of why interlock is resealed on a schedule rather than once.
These conditions do not set the price on their own, but they help explain why GTA interlock needs proper preparation and a re-sand before the sealer goes on. If you are wondering how long that protection lasts, read our guide on how often you should reseal interlock.
What a sealing job actually includes
When you pay for interlock sealing, you are paying for the preparation more than the final coat. A proper job is done in stages.
- Cleaning the surface so the sealer can bond instead of sealing dirt in.
- Removing weeds and topping up the joint sand that locks the pavers together.
- Treating stains where needed so they do not show through the new sealer.
- Applying the sealer evenly and letting it cure properly.
Seal Tech’s interlock cleaning, re-sanding and sealing service covers the full job from a clean surface to a cured sealer. Sealing will not fix a sunken base or standing water; those are separate issues, so ask us whether your surface suits sealing first or needs something else looked at.
Frequently Asked Questions
Why does the condition of the joints affect the quote?
The sand between the pavers is what locks them together. When it has washed out, the joints have to be re-sanded before the sealer goes on, or the surface stays vulnerable to weeds and shifting. The emptier the joints, the more time and sand the job takes.
Do stains make sealing cost more?
Moss, oil spots and organic staining have to be cleaned or treated before sealing, so a heavily stained surface generally takes more preparation than a clean one. Sealer will not hide deep stains; it can make them permanent.
Can I seal over the old sealer?
Only if the old sealer is still sound and clean. Loose, flaking or hazy old sealer stops the new coat from bonding properly. Ask us whether your surface suits another coat or needs the old product addressed first.
What should I include in a quote request?
Send a few clear photos of the whole surface and the worst spots, along with a rough idea of the size. Ryan calls back and asks the few questions that matter for pricing, and you will get a free written quote.
Seal Tech Inc. serves Scarborough, Toronto, North York, Markham, Vaughan and the rest of the Greater Toronto Area. Call (416) 966-4200 for a free written quote, or contact us to send photos of your surface.
